Numerical Simulation on the Structural Parameter Optimization of Ore Block for Non-pillar Continuous Mining

ZHANG Bao,ZHANG Yougang,ZHANG Wenyi,LI Xiangdong,SHENG Jia
DOI: https://doi.org/10.13827/j.cnki.kyyk.2013.02.016
2013-01-01
Abstract:According to mining conditions and production capacity of Shihu gold mine,a three-dimensional elasto-plastic numerical simulation software was used to analyze the stability of ore block with different maximum height of emptied area,the numbers of pre-mined slice and the different exposed stope areas under different thickness for trackless mechanized upward horizontal slice stoping and filling The more reasonable structural parameters of ore block were received,which providing a guidance for future mining design,production and safety management in Shihu gold mine.
What problem does this paper attempt to address?