Control optimization on proppant spiting

Wu Yahong,Wen Qingzhi,Zhang Lingxiao,Sun Qianqian,Wang Li,Guo Shengtao
DOI: https://doi.org/10.6056/dkyqt201205029
2012-01-01
Abstract:In the process of fracturing,the proppant plays an important role in maintaining high conductivity.At the same time,the back flowing of proppant also affects the normal production of fractured well,damages the underground and ground equipments,adds more production and workover costs.In order to keep effective propping of proppant in the fractures,this paper established the settling velocity of proppant in power-law fluid,which considered the influence of particle interference and wall effect on the settling velocity being revised.The calculation model of settling distance was built.According to the critical velocity,the amount of proppant spiting was calculated.At last,taking a real well as an example,this paper optimized and designed the proppant spiting aimed at the nozzle diameter selected according to the different well head pressure.The calculation results show that the model proposed can effectively guide the site operation and has positive significance.
What problem does this paper attempt to address?