Principle of proppant settlement in fracture.

Wen Qingzhi,Luo Mingliang,Li Jiana
DOI: https://doi.org/10.3969/j.issn.1009-9603.2009.03.033
2009-01-01
Abstract:Hydraulic fracturing is an important technique to stimulate the reservoir production and the key point in hydraulic fracturing is to form sand packed fractures with high-conductivity.Through researching the principle of proppant settlement in vertical fractures,a mathematical model about proppant settlement, which is affected by many factors such as geometric sizes,performances of the fracturing fluids and so on,was established.And the relevant computer software was programmed.Analysis of sensitivity revealed the main factors affecting the settlement of proppant and the principle of the settlement in the carrier fluid.Based on the experiences of well Dabei11-29,the design for the construction of displacement,the performance of fracturing fluid and the parameters of proppant were optimized to aim at the best distribution state of the proppant.All these parameters obtained after the optimization can be used to guide the designs and operations on the fracturing wells.
What problem does this paper attempt to address?