Comprehensive Evaluation Method for Hydropower Projects Based on Stochastic Weight Assignment and Its Application

Chang-yi XU,Deng-hua ZHONG,Guang-jing CAO
DOI: https://doi.org/10.3876/j.issn.1000-1980.2008.03.029
2008-01-01
Abstract:In consideration of the characteristics of large-scale hydroelectric projects,a multi-objective comprehensive evaluation method is established.Combining the stochastic weight assignment method for weights calculation and the Monte-Carlo simulation method,this method is used to analyze the effects of the changes of weights on evaluation results,which can be used in comparative analysis of multiple programs.The method has been applied to the selection of the normal water level for the Wudongde Hydropower Station on the Jinsha River,proving its feasibility and providing a basis for choosing programs at the planning stage.
What problem does this paper attempt to address?