PERFORMANCE OF THE COMBINED ACTIVATED SLUDGE-CONSTRUCTED WETLAND SYSTEM FOR POLLUTANT REMOVAL

Li-juan WAN,Hao WANG,Fang WANG,Yu-ming HUANG
DOI: https://doi.org/10.3321/j.issn:0254-6108.2007.06.020
IF: 4.236
2007-01-01
Environmental Chemistry
Abstract:A pilot-scale wastewater treatment system combined by activated sludge and four subsurface constructed wetlands in series was sampled for one year to study the system performance for common contaminants in countryside wastewater.Yearly average results showed that when the average wastewater flow was 82 T·d-1(36—132 T·d-1) corresponding to hydraulic loading rate of 0.52—1.88m·d-1,the combined system removed 75% of the TSS,71% of the AN (ammonium),38% of the TP,81% of the COD,and 88% of the BOD5,respectively.The constructed wetlands system removed 39%,55%,5%,18% and 48%,of COD,BOD5,AN,TP and SS,respectively.ANOVA statistical analysis performed on the data set of 12 months of operation showed that the hydraulic loading rate(HLR)and the treatment unit were major factors that control the performance of combined system for the target pollutants.Significant removal of organic matter such as COD,BOD5and SS in the constructed wetlands system was found in the first constructed wetland,however,a accumulative removal was found for nutrient matter such as AN and TP.A survey of electron acceptors such as SO42-,NO3-and NO2- in the constructed wetlands system indicated that denitrification was estimated to be significant for organic matter removal in constructed wetland beds,in contrast,the organic matter removal by sulfate reduction was minor.
What problem does this paper attempt to address?