Development and Application of a Drilling Plug-free Staged Cementer

Tian Qizhong,Li Na,Liu Jianxin,Zhang Ruixia,Yang Jie
DOI: https://doi.org/10.3969/j.issn.1001-4578.2013.04.019
2013-01-01
Abstract:The well completion technology without inner tube and drilling plug can avoid operation with drilling plug,timely running to fish string after finishing cementing and pulling rubber plug and equipment in tube.But the place above blind flange is dead space.The problem of closing socket's running difficulty cannot be solved.In addition the inner-circle steps with small inner diameter will be left after pulling blind flange assembly.This brings about inconveniences for later operation.Therefore,the new drilling plug-free staged cementer was developed.The cementer consists of upper joint,external cylinder and injection assembly.It has both functions of injection and blind flange.The injection assembly bottom is installed with relief valve,avoiding the formation of dead space.As a result the problem of closing socket's running difficulty caused by the socket closure has been solved effectively.The lower part of the cementer can directly be connected with matching open-hole packer,thus simplifying completion string.The field application in over 90 wells shows that the average completion cycle of the device is shortened by one day.The releasing force of fishing assembly is between 100 kN and 150 kN.This completely agrees with the safety requirement of field construction with a 100% operating success rate.
What problem does this paper attempt to address?