The plug-drilling-free staged cementing completion string

Tian Qizhong,Peng Hanxiu,Liu Jianxin
2011-01-01
Abstract:There exist small inner tube, limited displacement of cement injection, replaced displacement capacity required by turbulence and unideal cementing quality in inner-tube plug-drilling-free cementing technology. Therefore, a type of plug-drilling-free staged cementing completion string was developed. It adopts the blanking plug with the positioning mechanism in cementing string to replace the blind flange in the original completion string and thus omits the process of drilling out the cement plug. The technology has been applied to over 30 horizontal wells in Shengli Oilfield and Chepaizi Oilfield. The average completion cycle has been shortened by one day, compared with the original cycle. The success rate of construction has reached 100%. The large-bore completion provides great convenience for subsequent operation and construction. Thus, the operation becomes simple and the costs have been reduced.