Application of Staged Fracture Technology with Open-hole Packer in Shengli Oilfield

Zhang Jian,Ren Jiamin,Tian Haoran,Li Yubao
DOI: https://doi.org/10.3969/j.issn.1001-4578.2013.04.024
2013-01-01
Abstract:To explore the new approach to improving single well production and recovery ratio in low permeability reservoirs,it was proposed that multistage staged fracture technology for open-hole completed well is applied in Block 154 of Fan in Shengli Oilfield.And an exploratory test of the localized completion tool of multistage staged fracture was carried out in Well 4 of Ping in Block 154 of Fan.The smooth running of the horizontal open-hole staged fracture string in Well 4 of Ping has laid the foundation for later open-hole staged fracture operation and provided the precious experience for later construction.After 25 hours of operation the staged fracture operation was completed smoothly in Well 4 of Ping.The pressure for injection ball of different stages to open sliding sleeve is 51~ 59 MPa.The sleeves were opened properly and smoothly.The field practice proves that proper application of horizontal well technology to develop low permeability reservoirs can shorten the operating time,improve the reservoir producing level and achieve economical and high-efficiency development.
What problem does this paper attempt to address?