Stability Study on Excavation and Lining Structure of Guandi Tailrace Bifurcation Tunnel

Lin Peng,Zhou Yaneng,Wang Renkun,Zhou Weiyuan
DOI: https://doi.org/10.3969/j.issn.1673-0836.2010.02.013
2010-01-01
Abstract:In underground excavation of hydraulic engineering,a three-dimensional structure exists in the junction of large-span tailrace bifurcation tunnel,which is hard to analyze with traditional methods due to its complicated mechanical behavior,large displacement and heavy stress concentration.In this paper,FLAC3D is employed to analyze the deformation,stress and yield zone in the surrounding rock mass under excavation of the tailrace bifurcation tunnel of the Guandi hydropower Station.The reinforcing effect of shotcrete and bolt supporting under different conditions of initial stress releasing load is reviewed.Then,according to the loads in excavation,operation and maintenance,the deformation and stress in surrounding rock mass and the lining structure are analyzed.Finally the control case is indicated and measures to maintain the stability of bifurcation tunnel are proposed.The results show that the maximum subsidence displacement of vault is 23 mm,the maximum principal stress is 3.8 MPa for side wall and 2.0~2.6 MPa for lining,plastic zones are locally connected between two branch tunnels.The shotcrete and bolt supporting system are in rational condition and ensure the stability of surrounding rock mass.The conclusions from this study have been applied to the design of the tailrace bifurcation tunnel and are also beneficial to the design and construction of similar projects.
What problem does this paper attempt to address?