Temperature Control for Concrete Casting of No.0 and No.1 Blocks of Large Box Girder

TANG Ming-min,ZHANG Hong-jie,WAN Shui
DOI: https://doi.org/10.3969/j.issn.1671-7767.2013.02.013
2013-01-01
Abstract:In order to control the difference of the temperature inside and outside the cast-in-situ No.0 and No.1 blocks of the box girder over bridge piers and reduce the potential risks of the structure induced by great temperature difference,such as the occurrence of cracks,a real bridge was cited as an example.The finite element software was adopted to carry out simulation analysis of the transient temperature field of the No.0 and No.1 blocks of the box girder after concrete casting,and temperature sensors were embedded to monitor the temperature field.The results of the analysis indicated that compared with the top slab,webs and the bottom slab,the temperature in the diaphragms was higher and was the latest to reach the maximum value(45 ℃);when the concrete was cast in layers and cold water pipes were buried,the temperature of each component was apparently reduced,the difference of the temperature inside the structure and outside the structure could be well controlled to be less than 20 ℃,and after the formworks were dismantled,no cracks were found.
What problem does this paper attempt to address?