Failure Mechanism Analysis of Bottom Plate of Prestressed Concrete Box Girder Bridge During Construction

项贻强,唐国斌,朱汉华,晁春峰
DOI: https://doi.org/10.19721/j.cnki.1001-7372.2010.05.011
2010-01-01
Abstract:Aimed at problem on failure of bottom plate of prestressed concrete box girder bridge during cantilever construction,its failure mechanism and prevention measure were studied.Taking a prestressed concrete box girder bridge as example,construction process of the box girder was simulated.Considering material nonlinear,the process of bottom plate crack was simulated and failure mechanism of bottom plate was analyzed.Based on it,according to code,prevention measure was proposed and was applied to practice.The results indicate that the rib is in the worst mechanical area.Failure of box girder is mainly induced by extending of diagonal and tearing crack of rib under effect of radial force.In the future design of box girder,transverse bottom plate should support anti-shear bearing capacity,rib should satisfy the requirement of minimum duct space.
What problem does this paper attempt to address?