Study on the sediment demand of the Yangtze River

WANG Zhao-yin,HUANG Wen-dian,HE Yi-ping
DOI: https://doi.org/10.3321/j.issn:0468-155X.2008.01.005
2008-01-01
Abstract:The river sediment management should take into account simultaneously the sediment yield and the sediment demand.In this paper,the study of the sediment demand of the Yangtze River is carried out,considering the fluvial process,sediment balance in river mouth and the influences of human activities.The sediment demand in the Yangtze River consists of three parts: 1) sediment for fluvial processes;2) sediment for building materials;and 3) sediment for land creation.Constrained by the grand levees,the fluvial process of the middle and lower Yangtze River reaches the equilibrium mainly by adjusting the longitudinal profile defined by the minimum stream power.The present bed profile of the middle reach is lower greatly the equilibrium bed profile.Sedimentation would dominate the fluvial process for a long period of time.But the impoundment of the Three Gorges Reservoir modifies temporarily this process.In recent 20 years,the annual sediment load in the Yangtze River has reduced significantly.Human activities cause further reduction of the sediment load in the river.The land creation project of the Shanghai government needs a large amount of sediment.In the middle and lower Yangtze River,the sediment is mainly wash load in flood reason,and is bed material load in low flow season.Only about 90% of coarser sediment transported to the river mouth can be used for land creation.In order to perform the land creation project and maintain the equilibrium at the Yangtze River mouth,the annual sediment demand is about 300 million tons.Now,there is an annual sediment shortage of about 100 million tons.
What problem does this paper attempt to address?