Research on Application Technology of Steel Reinforced Concrete Composite Beam of Metro Station

WANG Wei,HAN Jian-wei,WANG Yu-jue,MA Ya-lin
DOI: https://doi.org/10.13238/j.issn.1004-2954.2012.12.009
2012-01-01
Abstract:When the late-poured band,which usually is reserved to solve the problem of concrete cracking caused by temperature stresses in the process of pouring the mass concrete,is constructed by inverse construction method,the traditional method is to installing the transfer band or temporary upright post.But the traditional method is an uneconomical method that often delays the construction schedule.A new type of structure called steel reinforced concrete composite beam were put forward in the paper to solve above problem.Meanwhile,finite element software were used to calculate and analyze the new type structure of steel reinforced concrete composite beam theoretically,including the bending resistance,shear resistance,pressure resistance and overall structural behavior.Besides,the detail structure stresses of the anchorage zone were also analyzed accurately by three-dimensional finite element software.Consequently,the most suitable anchorage length was identified as 1.0 m(that is two times of the beam's height).
What problem does this paper attempt to address?