DETAILING OF COAL UNLOADING CHUTE WITH SKEW BEAM OF LARGE THERMAL POWER PLANT

Qiang LI,Ze-jun WANG
DOI: https://doi.org/10.3969/j.issn.1001-6864.2009.01.015
2009-01-01
Abstract:To study the failure mechanism of Coal Unloading Chute with Skew Beam, 1/10 scale reinforced concrete mode has been preceded.The whole process from cracking to failure is studied.The experimental results show that the wall is not so much a fixed support to skew beam,the failure of skew beam is largely duo to movement,and there is a piece of crack along the bottom slab when it fails.Based on failure characteristic some detailing of Coal Unloading Chute with skew beam is brought forward.First,arrange the stirrup of skew beam gradually or overlapped to avoid the areas at both end of the beam without shear stirrups.Second,it is suitable to set up a counter fort retaining column or an integral column at the intersection of wall and beam.Third,make the link between the wall and skew beam an artificial plastic hinge so that the real working stage is more in line with the computation assumption that the torsional restraint has free rotation long the beam axial.
What problem does this paper attempt to address?