Inflow Forecast Research of to Beijing-Shijiazhuang Emergent Water Supply Reservoirs in the Middle Route of the South-to-North Water Transfer Project

牛存稳,贾仰文,彭辉
DOI: https://doi.org/10.3969/j.issn.1672-1683.2009.01.002
2009-01-01
Abstract:Gangnan,Huangbizhuang,Wangkuai and Xidayang are four reservoirs which are planned to provide emergent water supply to Beijing in the Shijiazhuang to Beijing Emergency Water Transfer Project(BSEWTP)which is considered a key part of the Middle Route component of the South-to-North Water Transfer Project.Based on the hydrologic cycle characteristics of reservoirs' catchments,a two-layer Tank Model was developed to forecast the reservoirs' inflow.A joint simulation for the serial Gangnan and Huangbizhuang reservoirs was conducted by coupling a reservoir operation model.Parameters transfer of Tank Model for PUB was researched by the contrast between the Wangkuai reservoir and Xidayang reservoir.After automatic optimization of the parameters in calibration period,model validation has been done in a 19-year period.The results showed:the simulation results of the reservoirs were good,and the errors can be accepted.
What problem does this paper attempt to address?