Reducing Deposition in TGP Reservoir by Dredging Coarse Sediment

周建军,曹慧群,张曼
2010-01-01
Abstract:A scheme of deposition control for the reservoir of Three Gorges Project (TGP) by dredging the coarse sediment at fixed reaches in the fluctuating backwater reaches is studied this paper. With the increasing capacity of dredging promoted by fast development and commercial needs of dredgers and large scale dredging projects, and the market of river-sand along the Yangtze, in particular, in recent decades, it is shown that reservoir dredging is not as expensive and low efficient as it was previously believed and large scale dredging for reservoir de-siltation seems to be worthy of consideration. Applying a well-applied model of unsteady flow and sediment transport, the authors studied many cases with respect to different flow and sediment conditions. Computation results reveal that 100 years accumulated deposition after dredging is to be decreased by 20%, and dredging and intercepting coarse sands are proved to be highly effective. This scheme may become a sustainable way for TGP to keep a low level of deposition and to protect its flood control capacity. This scheme may also serve as a reference for de-siltation of other river shaped reservoirs.
What problem does this paper attempt to address?