Study and Selection of Closure Dike Axis in Diversion Channel

戴光清,许杰,马旭东,杨庆
2009-01-01
Abstract:In order to reduce the difficulty of closure,the diversion channel closure dike axis of Zang-mu Hydropower project in Tibet is stuelied and optimized through model test.The traditional design conception which dike axis is vertical(or approximately vertical) to mainstream is not adopted,but in this case,the polyline dike axis is used.At the same time,main-flow closure is abandoned and lateral closure is adopted.Besides,taking full advantage of the remnant upstream pre-cofferdam and the right wall of channel entrance,the closure mouth is set in the river inside the right wall of cannel.It is concluded that the optimized closure dike axis significantly depresses the hydraulics indicators of closure mouth,and the purpose of decreasing the difficulty of closure is achieved.
What problem does this paper attempt to address?