Numerical analysis of inserted depth of suspended impervious curtain

ZHU Wei-dong,HAN Tong-chun
DOI: https://doi.org/10.3969/j.issn.1000-0860.2009.07.006
2009-01-01
Abstract:Through the arrangement of the suspended impervious curtain,the lowering of the ground water level around a foundation pit can be decreased,so as to reduce the impact from the dewatering for the excavation of the pit on the surrounding environment concerned,of which the inserted depth is closely related to the lowering of the ground water level.A numerical simulation is made herein on the relationship between the lowering of the ground water level for the pit and the inserted depth of the impervious curtain.It shows that an obvious ground water lowering occurs near the curtain,and furthermore,the lowering of the water level outside of the pit is relatively increases along with the increase of the inserted depth.The efficiency of the water cut-off effect from the impervious curtain calculated with the numerical simulation method is demonstrated by the simulation result,which provides a better reference for the application to the actual project.
What problem does this paper attempt to address?