Single Machine Scheduling Problem with Rate-Modifying Activities

ZHANG An,HE Yong
DOI: https://doi.org/10.3321/j.issn:1008-9497.2006.03.009
2006-01-01
Abstract:A single machine scheduling problem with rate-modifying activities is studied.The machine is supposed to have at most t breakdown time windows so as to modify its velocity,that is,the process time of each job may be different between before and after the breakdown.Thus the problem is to make a decision on whether and when to start the breakdown so as to minimize the maximum completion time,the total completion time or the weighted total completion time.For any fixed t,polynomial time optimal algorithms for the first two objectives are given respectively;and for the third objective a polynomial time optimal algorithm is also provided under the regularity assumption.