Integration of HIS for No.1 Army Sanitation Project with GE PACS

GUO ling-ling,CHANG jian-guo,LIAO yu-zhen
DOI: https://doi.org/10.3969/j.issn.1674-1633.2008.01.009
2008-01-01
Abstract:Describes the condition of the integral project of HIS for No.1 Army Sanitation Project and GE PACS,especially the key technique used in the project.Narrates briefly the development opportunity and prospect of the system integration at last.
What problem does this paper attempt to address?