3-D FEM Analysis of Tail Trace Tunnel in Wujiangdu Extension Project in P.R.China

LIU Xian-shan,LIU Xin-rong,WANG Jun
DOI: https://doi.org/10.3969/j.issn.1674-4764.2007.06.020
2007-01-01
Abstract:The limitation of self-programming software may be eliminated by powerful preprocessing-postprocessing and visual function of ANSYS software in complex civil engineering studies.A 3-D excavation deformation calculation and a lining structural analysis for different operation modes were carried out for the Tail Trace Tunnel in Wujiangdu Extension Project in P.R.China.The stress and displacement analysis and the support scheme of tail trace tunnel under different ratios of stress relaxation are processed.The water pressure is taken into consideration at the same time because it creates an unloading condition in the adjacent rock masses and makes the yielded rock elastic.In preprocessing,a sub-model is adopted which gives deformation results in agreement with those in the actual tunnel.Finally,a redevelopment technique combined with other computer languages is brought forward as is trend of ANSYS software development.This technique will satisfy model building and calculation needs for complex underground projects.
What problem does this paper attempt to address?