Experimental research on steel plate shear wall

NIE Jianguo,FAN Jiansheng,HUANG Yuan,ZHOU Wei,WANG Dasui,LU Daoyuan
DOI: https://doi.org/10.14006/j.jzjgxb.2010.09.015
2010-01-01
Abstract:Tianjin Jinta Tower is the first high-rise building built with steel plate shear wall in China.The main lateral force resisting systems is the composite core tube composed of steel plate shear walls and concrete filled steel tubular columns.In order to study the mechanical behavior of this structural system and to provide design validation,two model specimens of 2-bay and 5-storey steel plate shear wall with 1 ∶ 5 scale were tested under low-cycle reverse loading.The steel shear plate of the first specimen was connected with the frame by bolts,and the plate was not stiffened.The steel plate shear wall of the second specimen was connected with the frame by welding,and the steel plate was stiffened by channels.The test results show that the steel plate shear wall has higher loading capacity,full hysteresis loops and stable energy dissipation.But for steel plate shear wall without stiffening,local buckling will occur at the early stage of loading,and the pinching of hysteresis loops can be observed with S shape.For steel plate shear wall with stiffening,no buckling is observed during the loading process,and plump hysteresis loops are obtained.The specimen connected with high strength bolts emit noise for the slip of friction surface during loading,which maybe of concern for serviceability condition.
What problem does this paper attempt to address?