Key technologies to optimize operation system for large-scale hydropower stations in provincial power grid

CHENG Chun-tian,LIAO Sheng-li,WU Xin-yu,ZHANG Shi-qin
DOI: https://doi.org/10.13243/j.cnki.slxb.2010.04.016
IF: 2.4
2010-01-01
Journal of Hydraulic Engineering
Abstract:A spatio-temporal resolution to solve the optimal operation problem of complex inter-basin hydropower systems based on analyzing the existing optimal operation technologies and using computer science and artificial intelligence is suggested.The resolution includes directed-graph technology to describe the topology of cascade hydropower stations,smart memory and script control technology to set the restrictions automatically,interface programming and the same model in MVC to handle the linkage between table and chart and multi-reservoir operation.The mid-long term runoff prediction systems,long-medium-short term optimal operation systems and real-time operation systems in power grids of the Fujian Province,Yunnan Province and Guizhou Province,which adopting these technologies,have been applied successfully.
What problem does this paper attempt to address?