APPLICATION:SUPPORTING STRUCTURE OF DEEP FOUNDATION PIT REINFORCED BY PRE-STRESSED CABLE

JI Chao-jiang,JIANG Jun,LIN De-jian
DOI: https://doi.org/10.3969/j.issn.1001-6864.2010.03.032
2010-01-01
Abstract:The observing displacement of the supporting structure and axial force of the pre-stressed cable for dock before and after reinforced are carried out. On-site monitoring results show that,after reinforced,the displacement level of the supporting pile top can be reduced.In the process of filling,displacement-time curve of the supporting pile top present ladder-type upward trend,and gradually stabilized.The axial force of pre-stressed cable has experienced three phases: the loss of pre-stress phase,growth phase and the stabilization phase. On the initial stage of locking,the pre-stressed cable had experienced the loss of pre-stress,and was consistent with the displacement mode of supporting pile top.