Field test on pore water pressure induced by PTC pile installation in soft ground

Du Guangyin,Yu Chuang,Liu Songyu
2009-01-01
Abstract:Precast pile installation induces the excess pore water pressure in soft ground.The prestressed tubular concrete pile(PTC pile) installation using hammering method causes the increase in excess pore water pressure of surrounding clays in soft ground.The following results are obtained by filed test.The excess pore water pressure increases with time during pile installation and dissipates with time after installation.The dissipation time of excess pore pressure varies with the time and the distance from the pile.The dissipation rate initially is larger than later.The longer the dissipation time,the closer the distance is.And the maximum excess pore water pressure is nearly 1.5 times of the effective overburden stress in ground soils.In the end,the measure controlling the excess pore water pressure pile installation is presented.
What problem does this paper attempt to address?