Measurement of CPⅢ Control Net for Ballastless Track of High-speed Railway

郝亚东,周建郑,孙请娟,马建设
DOI: https://doi.org/10.3969/j.issn.1006-2106.2010.11.009
2010-01-01
Abstract:Research purposes: According to the construction of Ballastless ride request,studying network layout and survey methods of CP Ⅲ control for meeting the construction requirements for.Studying to meet the construction requirements of the CP Ⅲ control network location accuracy requirements and CP Ⅲ Control Network relative error and repeatable measurement error precision control indicators,which explicitly CP Ⅲ Control Network error,and ultimately to meet the non-ballast track construction on the smoothness requirements Measurement of protection provided.Research conclusions:(1) CP Ⅲ control network is installed evenly along the railway and the multiple-direction intersection in rear is adopted in the measurement.This is crucial to control of the relative error between measurement spots of CP Ⅲ control network.(2) The relative error between measurement spots ofCP Ⅲ Control Network and the repeatable precision control of the measurement error can meet meet the requirements of the track regularity.
What problem does this paper attempt to address?