Reconstruction of Coagulation and Sedimentation System of Bujihe Wastewater Treatment Plant in Shenzhen City

Shu-mei WANG,Bao-zhen WANG,Xiang-dong CAO,Wen-biao JIN,Xian-kui MENG,Ying-jun MA,Yi ZHANG
DOI: https://doi.org/10.3321/j.issn:1000-4602.2007.06.006
2007-01-01
Abstract:The technological characteristics,construction situation,operation and commissioning effect,techno-economic indexes,design experience etc.of reconstruction project of old coagulation and sedimentation system in Bujihe Wastewater Treatment Plant were introduced to provide a set of reliable schemes for reconstructing old wastewater treatment plants with the enhanced hybrid submerged biofilm/activated sludge(EHYBFAS) process.The reconstruction project has a treatment scale of 10×104 m3/d,land area of 1 hm2,wastewater treatment investment of 700-800 Yuan/(m3/d) and operation cost of 0.5 Yuan/m3.
What problem does this paper attempt to address?