General Design Considerations

Prabir Basu,Cen Kefa,Louis Jestin
DOI: https://doi.org/10.1007/978-1-4612-1250-8_2
2000-01-01
Abstract: A boiler, whether used in a process or utility plant, is a major piece of equipment. So, the purchaser applies much care to its procurement. The degree of sophistication and the extent of detail of the procurement process may vary depending on the purpose and size of boiler, but the process generally follows a common format. Typically, it starts with the preparation of a detailed specification, invitation and selection of bids, contract award, project execution, and finally the acceptance of the plant. The boiler supplier, on its part, ensures that all expectations of the purchaser are met and that the price is competitive. The vendor goes through different stages of design, construction, and commissioning. The design stages are discussed later in section 2–2. The following section discusses the scope of the boiler specifications.