Single machine batch scheduling problem with family setup times and release dates to minimize makespan

J. J. Yuan,Z. H. Liu,C. T. Ng,T. C. E. Cheng
DOI: https://doi.org/10.1007/s10951-006-8776-2
2006-01-01
Journal of Scheduling
Abstract:In this paper we consider the single machine batch scheduling problem with family setup times and release dates to minimize makespan. We show that this problem is strongly NP-hard, and give an O(n (n/m+1)^m) time dynamic programming algorithm and an O(mk^kP^2k-1) time dynamic programming algorithm for the problem, where n is the number of jobs, m is the number of families, k is the number of distinct release dates and P is the sum of the setup times of all the families and the processing times of all the jobs. We further give a heuristic with a performance ratio 2. We also give a polynomial-time approximation scheme (PTAS) for the problem.