Single Machine Scheduling with Sequence-Dependent Family Setups to Minimize Maximum Lateness

F Jin,J N D Gupta,S Song,C Wu
DOI: https://doi.org/10.1057/jors.2009.63
IF: 3.6
2010-01-01
Journal of the Operational Research Society
Abstract:Motivated by a real-life scheduling problem in a steel wire factory in China, this paper considers the single machine scheduling problem with sequence-dependent family setup times to minimize maximum lateness. In view of the NP-hard nature of the problem, structural (dominance and neighbourhood) properties of the problem are described and used in the tabu search algorithms to find optimal or near-optimal schedules. These proposed structural properties quickly exclude unpromising and/or non-improving neighbours from further search. Empirical results on the randomly generated and real-life problem instances from a factory in China show that the proposed heuristic algorithms utilizing the structural properties can obtain optimal or near optimal solutions with a reasonable computational effort.
What problem does this paper attempt to address?