Commissioning and initial operation of HL-3 vacuum system

Chengzhi Cao,Yanfeng Xie,Xiangmei Huang,Yi Hu,Hong Ran,Chenghe Cui,Jun Zhou,Xiaoyan Gao,Xiao Cai,Xiaoquan Ji,Zeng Cao,Wulyu Zhong,Min Xu,HL-3 team
DOI: https://doi.org/10.1016/j.fusengdes.2024.114289
IF: 1.905
2024-04-01
Fusion Engineering and Design
Abstract:HL-3 is a medium-sized tokamak and aims at developing the high performance plasma and engineering toward ITER and the fusion reactor. As the critical system of HL-3, vacuum system consists of ultra-high vacuum pumping system, wall conditioning system, gas injection system and auxiliary system. Based on the characteristics of these systems, engineering commissioning had been performed for functional confirmation and troubleshooting. With the completed debugged systems, the preparation of the vacuum environment, first wall and fueling of the device had been completed with various technologies, and it provided essential conditions for the first plasma of HL-3. The initial operation of vacuum system had been carried out, and the vacuum system capability was verified by the results, which provides helpful engineering experiences.
nuclear science & technology
What problem does this paper attempt to address?