Neutronics And Thermal-Hydraulics Study On Maximizing In Situ Utilization Of U-233 In The Th-U5-Fueled Htr-Pm
Xia Bing,Li Fu,Wei Chunlin,Chen Fubing
2014-01-01
Abstract:Thorium is very attractive as sustainable resource in nuclear industry for its large resource inventory, high potential conversion ratio in thermal reactors because of the produced 233U, and less amount of long life MA products. HTR-PM is a demonstration plant of the modular high temperature reactor with two pebble-bed cores of 250 MWth. In a series of previous works, the feasibility of maximizing thorium utilization and minimizing the refueling effort of uranium fissile under the framework of HTR-PM has been investigated. Two types of thorium-based fuelling strategies of in situ utilization in HTR-PM were discussed, namely the Th+ HEU (93% enriched) MOX fuel schemes and the Th+ LEU SEP (uranium and thorium are loaded into SEParate pebbles) schemes, respectively. In this work, further investigation was implemented, including comprehensive parametric analysis on both strategies mentioned above by implementing coupled neutronics and thermal-hydraulics calculations and transient analysis in accidental conditions. The analysis on MOX schemes reveals that the one can obtain further uranium ore saving with about 9% uranium atomic fraction in the MOX fuels as the C/HM ratio decreases, compared with the traditional LEU loading. This is mainly attributed to the reduction of core leakage when the heavy metal loading increases. However, as the C/HM ratio decreases, most of the safety features of HTR-PM are observed to get worse, especially the maximum fuel temperature after DLOFC accident, which restricts the improvement of uranium ore saving. The optimized uranium ore saving is about 20 kg/GWd, corresponding to the thorium loading requirement about 10 kg/GWd, with far insufficient utilization fraction of thorium fuel up to 6% and relatively high-level residual 233U in spent fuels of about 0.2 kg/GWd. On the other hand, one can obtain superior performance of in situ utilization of thorium in the SEP schemes if the thorium residence time is lengthened sufficiently. A series of SEP schemes of 7g heavy metal loading per pebble are investigated, with varied uranium to thorium ratio and thorium discharge burn-up, as well as fixed uranium discharge burn-up of 90 GWd/tHM. When the ratio of uranium to thorium is set as 12: 3 and the thorium discharge burn-up goes as high as 200 GWd/tHM, the uranium ore saving for SEP schemes can reach about 10 kg/GWd, compared with the LEU loading scheme. Although this saving is smaller than the MOX case, the thorium loading requirement decreases dramatically with the increased thorium discharge burn-up, maximally one order of magnitude lower than the MOX schemes, indicating that the cost of thorium fuel can be minimized with relatively considerable uranium loading saving. The superior performance of the SEP scheme can be mainly attributed to the sufficient burning of thorium fuel, with maximum in-core utilization of thorium of more than 20%. It is concluded that the SEP schemes are better choices for in situ utilization of thorium and minimizing the uranium loading requirement than the MOX schemes.