Evaluation of Pressure Maintenance by Internal Gas Injection in Volumetrically Controlled Reservoirs

E. Charles Patton
DOI: https://doi.org/10.2118/947112-g
1947-12-01
Transactions of the AIME
Abstract:Abstract A comprehensive discussion is presented of a proposed method for utilizing thedeterminable basic physical facts about tight, volumetric-type reservoirs andtheir contained fluids, to arrive at the feasibility of injecting gas thereinand to estimate the minimum about the profit to be derived there from. A methodis introduced for correlating laboratory relative permeability data with fieldperformance history, and a method of relating the one to the other so as toenable predictions to be made of future performance based on past performance.This incorporates the substitution into the material-balance equations of afactor designed partially to take into account deviations from ideal behaviorresulting from nonhomogeneity of the reservoir rock, the importance of thisfactor to the reliability of such predictions is not to be minimized. A theoretical interpretation of the most dearly correct method of applyingflash and differential laboratory data in their appropriate places in thematerial-balance equations, and a set of symbols to accommodate the distinctionbetween these two different types of data is developed. A set of equations for converting material-balance predictions directly to atime basis is given; a method of predicting the time at which the fieldeconomic limit will be reached, and a tentative method for predicting relativenumber of wells on the pump at any time under pressure maintenance as comparedwith primary performance have been described. These three concepts areprerequisites for the accurate evaluation of the economic benefits of pressuremaintenance. The equations and methods described may also be utilized to predict therelationship between gas-production rate and time to serve as a basis fordesign of proper size gasoline or compressor plant to accommodate an entire oilfield, or to predict the most economically advantageous time to begin agas-injection project. The sale of residue gas in connection with the operation of a reservoir bynatural depletion under some circumstances may prove economically superior topressure maintenance y gas injection in spite of the expected increases inultimate oil recovery by the latter type of operation. A situation such as thismay arise from the interrelationship of the many physical and economicvariables involved. T.P. 2098
What problem does this paper attempt to address?