Optimization of Deep-hole Blasting Technology in Tuwu Copper Mine

Wang Xiao-ya
Abstract:In order to solve the technical problems in blasting construction of the Tuwu Copper mine,such as high boulder yield,slope safety,loss and dilution ratio,an optimized solution was put forward by using deep-hole controlled explosion,including rational blast parameters,interval charging,appropriate explosive materials,hole by hole firing,slope control blasting technology,separate drilling and separate initiating in the process of construction,weak loose blasting.Finally,good blasting effect was achieved in actual mining by using this scheme.
Engineering
What problem does this paper attempt to address?