How to Commission, Operate and Maintain a Large Future Accelerator Complex from Far Remote

P. Czarapata,D. Hartill,S. Myers,S. Peggs,N. Phinney,M. Serio,N. Toge,F. Willeke,C. Zhang
DOI: https://doi.org/10.48550/arXiv.cs/0110029
2002-01-04
Abstract:A study on future large accelerators [1] has considered a facility, which is designed, built and operated by a worldwide collaboration of equal partner institutions, and which is remote from most of these institutions. The full range of operation was considered including commi-ssioning, machine development, maintenance, trouble shooting and repair. Experience from existing accele-rators confirms that most of these activities are already performed 'remotely'. The large high-energy physics ex-periments and astronomy projects, already involve inter-national collaborations of distant institutions. Based on this experience, the prospects for a machine operated remotely from far sites are encouraging. Experts from each laboratory would remain at their home institution but continue to participate in the operation of the machine after construction. Experts are required to be on site only during initial commissioning and for par-ticularly difficult problems. Repairs require an on-site non-expert maintenance crew. Most of the interventions can be made without an expert and many of the rest resolved with remote assistance. There appears to be no technical obstacle to controlling an accelerator from a distance. The major challenge is to solve the complex management and communication problems.
Other Computer Science
What problem does this paper attempt to address?
The problem that this paper attempts to solve is how to design, construct and operate a large - scale future accelerator facility far away from most collaborating institutions. Specifically, the paper explores how to carry out the debugging, operation and maintenance of the accelerator through far - remote sites and ensure its efficient operation. ### Main problems include: 1. **International multi - laboratory collaboration**: - How to organize multiple laboratories around the world to jointly design, build and operate a large - scale accelerator facility. - Ensure the equal status and continuous commitment of each participating laboratory in the project. 2. **Technical feasibility of remote operation**: - Whether the debugging, daily operation, troubleshooting and maintenance of the accelerator can be effectively completed through remote control technology. - Whether existing and future communication technologies can support this remote operation mode. 3. **Management and communication challenges**: - How to solve complex management problems and ensure that teams in different geographical locations can collaborate efficiently. - How to maintain effective communication between experts, especially when dealing with complex problems. 4. **Staffing and responsibility allocation**: - How many on - site staff are required for daily maintenance and emergency repair. - Whether experts need to visit the site frequently or can solve problems through remote assistance. 5. **Hardware design requirements**: - What characteristics should the accelerator hardware components have in their design to support remote diagnosis and maintenance (such as high modularity, standardization, redundant design, etc.). - How to ensure the reliability and long - life of the hardware and reduce the failure rate. ### The core conclusions of the paper are: - Technically, the hierarchical architecture of modern control systems and the progress of communication technologies make it possible to operate accelerators at a long distance. - The main challenges lie in management and communication, rather than technical barriers. - Through a reasonable organizational structure and advanced technical support, most operation tasks can be remotely executed. - Only a small number of non - expert maintenance personnel are required on - site, and most experts can remotely participate in the operation and support within their respective research institutions. The paper also emphasizes the importance of a comprehensive remote diagnosis system, modular design and standardization to ensure the efficient operation and rapid response ability of the accelerator.