Concept of Staged Approach for International Fusion Materials Irradiation Facility

M. Sugimoto,M. Kinsho,H. Takeuchi
DOI: https://doi.org/10.48550/arXiv.physics/0008187
2000-08-20
Abstract:The intense neutron source for development of fusion materials planned by international collaboration makes a new step to clarify the technical issues for realizing the 40 MeV, 250 mA deuteron beam facility. The baseline concept employs two identical 125 mA linac modules whose beams are combined at the flowing lithium target. Recent work for reducing the cost loading concerns the staged deployment of the full irradiation capability in three steps. The Japanese activity about the design and development study about IFMIF accelerator in this year is presented and the schedule of next several years is overviewed.
Accelerator Physics
What problem does this paper attempt to address?
The problem that this paper attempts to solve is the technical problems in the development and verification of high - intensity neutron source facilities for fusion material research (i.e., the International Fusion Materials Irradiation Facility, IFMIF), and proposes a phased implementation method to reduce costs and match the development plan of fusion reactors. ### Specific problems include: 1. **Requirement for achieving high - energy proton beams**: - IFMIF requires a 250 mA, 40 MeV deuteron beam to meet the requirements of neutron flux levels (wall loading equivalent to 2 MW/m², approximately equal to 9×10¹³ neutrons/cm²/s, or 19 dpa per year for iron). For this purpose, two identical 175 MHz, 125 mA linear accelerator modules (linac) are designed, and their beams are combined on a flowing lithium target. 2. **Reducing costs and optimizing project schedules**: - In order to reduce the construction cost of the facility (estimated at $800 million in 1996) and optimize the project schedule, a plan for gradually deploying the full irradiation capacity in three phases is proposed. These three phases achieve 20%, 50% and 100% of the full irradiation capacity respectively. 3. **Solutions to key technical problems**: - Before construction begins, some key technical problems must be solved, such as: - An extremely stable 155 mA deuteron injector - A 175 MHz coupled - cavity continuous - wave radio - frequency quadrupole (RFQ) - Accurate beam dynamics simulation to achieve beam loss control 4. **Specific implementation of phased design**: - The phased design simplifies the layout of the two 40 MeV deuteron linear accelerator modules, making them easy to upgrade. The main parameters such as beam current and energy in each phase are different to gradually achieve the final goal. ### Summary: This paper mainly explores how to construct and verify IFMIF through a phased method, thereby reducing overall costs and ensuring technical feasibility and reliability. This method not only contributes to the research and development of fusion materials, but also provides important engineering data and technical support for future fusion reactors.