Multi-defect risk evaluation method (MREM) for lifetime performance evolution of tunnel system

Yi Shen,Dawei Huang,Tao Liu,Qing Ai,Hehua Zhu
DOI: https://doi.org/10.1016/j.tust.2024.105775
IF: 6.9
2024-04-29
Tunnelling and Underground Space Technology
Abstract:Suffered from massive degradation phenomenon and limited maintenance budgets, the tunnel system faces challenging issues in its operation and maintenance based on the systematic risk and lifetime performance. To this end, this study proposes a multi-defect risk evaluation method (MREM) of tunnel system. Firstly, the key defects were selected by failure mode and effect analysis (FMEA) as observation variables, and the hierarchical analysis system of tunnel was established. Combined with Bayesian network method, Weibull proportional hazard model (PHM) was established to predict the performance and remaining service life of tunnel under multiple defect conditions. The linear relationship between tunnel defect and potential factors was established by multiple indicators multiple causes (MIMIC) model, and tunnel serviceability index (TSI) was employed to evaluate the performance development of tunnel system. As a comparison, based on the assumption of the independence between the tunnel defects, the performance development of the tunnel system was evaluated by using the method of risk superposition, and the evaluation results of the two methods was analyzed. According to the prediction results of the remaining service life of Shanghai Metro Line 4 under the relevant six defects, results and conclusions are: (i) System risk evaluated by MIMIC is lower than risk superposition; (ii) The repair of major defects at specific locations can extend the service life of the tunnel; (iii) Attention should be paid to prevent the risk of tunnel failure caused by multiple defects occurring simultaneously in the future operation.
construction & building technology,engineering, civil
What problem does this paper attempt to address?