Abstract:The construction at TBM launching & break through area is a critical and frequent common process of tunneling construction. The accident will result in severe casualties and economic losses. This paper presents construction risk identification and evaluation at TBM launching & break through area based on Failure Mode and Effect Analysis (FMEA). Firstly tunneling construction process features are analyzed, failure modes are identified, and risk evaluation criterions are formulated. Secondly Risk Priority Number (RPN) is calculated according to expert questionnaires, risk-disastrous severity is classified. Lastly the validity of risk evaluation is verified through case analysis of typical metro accidents at TBM launching&break through area.