Prevention of preferential bridge icing using heat pipes. Executive summary August 1975--September 1976

A. Ferrara,G. Yenetchi
1976-09-01
Abstract:This report describes the results of a 27 month analytical and test program to investigate the use of heat pipes and renewable energy sources (specifically earth heat) to avoid the preferential freezing of highway bridge decks. Based on computer simulations of typical preferential icing events (days), a single system design is recommended for most U.S. locations. This design consists of nominal 0.5 inch heat pipes at the slab mid-plane, on 23 cm centers, connected to nominal 2 inch heat pipes in the ground via a pumped fluid loop, with 1 m of earth heat pipe provided for every 0.3 square meters of bridge deck. The report also provides preliminary assessment of the design requirements and costs of an alternate, solar collector design; it concludes that the solar collector design may offer economic advantages over the earth heat pipe system, and thus should be investigated further.
Environmental Science,Engineering
What problem does this paper attempt to address?