ASSESSMENT OF DURABILITY OF A BRIDGE ON POLISH-CZECH BORDER CONSTRUCTED WITH THE USE OF AN INCREMENTAL LAUNCHING TECHNOLOGY

S. Pradelok,M. Salamak,A. Radziecki
Abstract:Summary A bridge going through the Olse Valley at the border of Poland and Czech Republic in Cieszyn and Ceský Těsin is one of the larger and older prestressed structures in Poland. Due to its size (700 m), the geometric complexity (vertical and horizontal arch) and construction technology (incremental launching) is observed with a special care since its commissioning. At the end of 2013, after more than twenty years of operation, additional measurements and detailed examinations of the structure were carried out. This paper presents the conclusions from those actions and experiences from the conducted so far observations. They relate mainly to changes in the geometry of the structure and the condition of the superstructure and accessories. Keywords : Concrete Bridges, Post-Tensioned Concrete, Incremental Launching, Cathodic Protection. 1 Introduction The border bridge over the Olse Valley in Cieszyn is the first in Poland such large prestressed structure built with the use of incremental launching technology [1]. Due to the size, geometric complexity (Fig. 1) and the construction technology, it is particularly under observation since the commissioning. At the end of 2013, after more than twenty years of operation, additional measurements and detailed examination of its structure were conducted. a) b)
Engineering
What problem does this paper attempt to address?