ON A CFST TIED ARCH BRIDGE CONSTRUCTED BY INCREMENTAL LAUNCHING METHOD
C. Hu,J. Huang,Z. Dai,X. Shangguan,J. Shi
Abstract:This paper introduced a concrete filled steel tubular (CFST) tied arch bridge constructed by incremental launching method. The arch bridge (which span was 35m+120m+35m) was constructed on Shaoguan city, Guangdong Province, China, in 2003. Each foundation of this bridge was a single non-uniform section pile without bearing platform, the deck system were composed by two girders of single box and single room with tied bars in it, three circular CFST system were used in the main arch ring, and the suspension cables were a series of parallel wire cables. In the upper structure construction stage of this bridge, the deck system was constructed by incremental launching method, and then the main arch ring steel tube was constructed by vertical rotation method and the concrete of main arch ring was pumped along the steel tube, at the end, the deck system was connected with main arch ring by suspension cables. This construction method was applied to CFST tied arch bridge for its safety and economy, and was proved to a qualified construction method by a thorough detail inspection checks results in 2014 of this arch bridge.
Environmental Science,Engineering