Analysis on characteristics of liquescent sand foundation reinforced by multiple composite pile

Zhang Zhen-jion
Abstract:In order to optimize the composite pile(cement pile and gravel pile) to reinforce liquescent sand foundation,the shaking table tests of liquescent sand foundation reinforced by long cement pile and short gravel pile,long gravel pile and short cement pile,and long-short cement pile were conducted.The variation of the excess pore water pressure and the pore water pressure of different liquescent sand foundation models reinforced by multiple composite piles were analyzed,and the height change of soil surface was recorded to reveal the reinforced mechanism of the liquescent sand foundation reinforced by multiple composite piles.The test results show that the gravel pile is the main drainage channel in the process of vibration.The peak of the excess pore water pressure at different depth of long gravel pile and short cement pile is around 4.8 kPa,and when the test is over,the value is aroud 3.5 kPa,meaning that the long gravel pile can drain away deep water.The excess pore water pressure curves in the middle and low depth of the liquescent sand foundation reinforced by long cement pile and short gravel pile coincide basically.The peak of excess pore water pressure in different depth of long cement pile and short gravel pile is around 5 kPa and when the test is over,the value is aroud 2.5 kPa,meaning that the short gravel pile mainly drains away shallow water.The peak of pore water pressure in low depth of long-short cement pile is 0.7.The effect of the liquescent sand foundation reinforced by long-short cement pile mainly embodies in the shallow foundation and functions to separate soil-like barrier and restrain earthquake subsidence.This research may serve asa reference for liquefied soil reinforcement of practical engineering in the future.
Engineering,Environmental Science,Geology
What problem does this paper attempt to address?