Estimating from an optimisation model the cost of restricting road maintenance funding for a large network

Mark O. Harvey Department of Infrastructure,Transport,Regional Development,Communications and the Arts (Australian Government),Canberra,Australia
DOI: https://doi.org/10.1080/10298436.2024.2400540
2024-09-21
International Journal of Pavement Engineering
Abstract:With funds for road maintenance in short supply, it is important that best use be made of the available funds. Road maintenance optimisation over a large network of segments is challenging due to the enormous number of possible combinations of treatment types and timings to choose between. In a case study, a multi-stage optimisation process is applied to a large database of road segments to forecast economically optimal maintenance spending, first in the absence of budget constraints, second with budget constraints expressed as present values, and third with annual budget constraints. Annual constraints on spending are the most useful of the three optimisation problems considered because they smooth out fluctuations in spending over time. However, annual budget constraints present the most difficulties for optimisation. The multi-stage optimisation process overcomes these difficulties, finding solutions quite close to the optimum. The paper proposes ways to define marginal and incremental benefit–cost ratios for road maintenance and shows how they can be derived from the optimisation progress. The ratios indicate the economic value of relaxing constraints on spending and are comparable with benefit–cost ratios for capital projects.
construction & building technology,engineering, civil,materials science, characterization & testing
What problem does this paper attempt to address?