Constructing a cut-off dam inside a water-filled circular tunnel with backfill grouting

Che-An Chou,Shih-Wen Chen,Shih-Hao Cheng,Hung-Jiun Liao
DOI: https://doi.org/10.1016/j.tust.2024.105742
IF: 6.9
2024-04-04
Tunnelling and Underground Space Technology
Abstract:This study employs laboratory model tests for backfill grouting and numerical analyses (coupled analysis of the discrete element method and computational fluid dynamics, DEM-CFD coupling analysis) to investigate the feasibility of constructing a cut-off dam inside a water-filled circular tunnel using the backfill grouting method from the ground surface. Several improved backfill methods were studied to enhance the effectiveness of the cut-off dam. These methods include: (a) adding an additional backfill grouting hole between the double-row cut-off dam and applying pressurized grouting; (b) adjusting the number of backfill grouting holes per row of the cut-off dam; (c) simultaneously grouting the double-row cut-off dams to minimize the formation of interface fissures and voids; (d) adjusting the grout hole spacing of the double-row cut-off dams to reduce the volume of backfill material. Additionally, pressurized mortar grouting is a critical mass to ensure the water tightness of the cut-off dam. The implementation of these backfilling arrangements improves the effectiveness and watertight of the cut-off dam, thereby reducing the construction time and cost. The findings of this study can serve as a reference for water-filled tunnels and subsequent rehabilitation works in the future.
construction & building technology,engineering, civil
What problem does this paper attempt to address?