The Problem and Its Treatment about Wall Rock Stability of Goupitan Hydropower Station's Underground Powerhouse Station in Wu River

Xiang Nengwu
Abstract:The underground powerhouse of Goupitan Hydropower Station in Wu River is an oversize powerhouse built in the karst area.The stability problem of wall rock was prominent,and the factors that affect the wall rock stability including karst,disadvantage structure surface,and the block body combined by the two factors.During the process of prophase site choosing,collocation,and construction treatment,a great deal of study on project geology was implemented,and reasonable disposal and treatment scheme were brought forward.At present,the underground powerhouse digging was finished and has enter the phase of set installment.During the whole construction process,the events of water and mud surging,and block body losing stability did not occurred;the distortion of wall rock has been converted after construction treatment,and the effect of wall rock treatment seems good from the monitoring.
Engineering,Environmental Science,Geology
What problem does this paper attempt to address?