West Bank and Gaza - Emergency Municipal Services Rehabilitation Project : environmental management plan

A. Taha,Tariq,R. Sarraj,Salah Assat,Yahya Mousa
2003-01-31
Abstract:The Emergency Municipal Services Rehabilitation Project in the West Bank and Gaza, entails construction works, and operation of sewage and water supply, cleaning of networks regarding water, wastewater, and storm drainage, as well as construction of buildings, roads, and electricity rehabilitation. This will potentially generate water line breaks, dust emissions, noise disturbances, in addition to pollution resulting from construction debris, and/or toxic gases emanating from manholes, and other facilities. This environmental assessment stipulates mitigation measures as follows. A survey of existing facilities will be conducted during the design face to establish appropriate work schedules (limited to day times), provide traffic safety regulations, and enforce waste disposal regulations, while a re-vegetation plan will be implemented following construction. Waste disposal will be strictly controlled and monitored for disposal at selected (sanitary) landfills; this includes the provision of equipment to facilitate flushing, hosing, and cleaning, as well as air jitters to vacuum toxic gases from manholes. Solid waste burning will be prohibited, instead, wastes shall be incased, and transported to dumping sites (which should be fenced). Electricity poles to be relocated, or installed should be insulated, a practice to be followed by routine checks, and monitoring.
Engineering,Environmental Science
What problem does this paper attempt to address?