Prevention Cost Components Priorities for Urban Rail Infrastructure Projects
Izatul Farrita Mohd Kamar,Asmalia Che Ahmad,Mohmad Mohd Derus,,,
DOI: https://doi.org/10.30880/ijscet.2022.13.02.007
2022-05-30
International Journal of Sustainable Construction Engineering and Technology
Abstract:The Mass Rapid Transit (MRT) and the Light Rail Transit (LRT) have been establishedas the largest transport infrastructure projects in Malaysia and cost over RM40 billion. Due to the vigorous development of both projects, accidents at project sites have causedfatalities, serious injuries,and damage to properties. Many accidents haveoccurred during the operation of rail. In Malaysia, the latest rail accident occurred on 24thMay 2021had injured200 people when two coaches onthe Kelana Jaya LRT line collidedin the capital Kuala Lumpur. Railaccidents create significant economic impacts on the country, stakeholders,and society. Studies on the prevention costs during the pre-construction stage of a project are scarceand have mainly focused on the financial losses or accident costs incurred by the contractor and victim.Amongthe limitations of the existing safety and health cost models is that they do not include the costs incurred by the client for the safety prevention activities. Therefore, this research aims to study the types of prevention cost components that must be the priorities for urban rail infrastructureprojects. The data analysed in this study wasobtained from a total of eight (8) projects involved in the MRT 1 (SBK Line) and ten (10) projects involved in the MRT 2 (SPP Line). The prevention cost components priorities were determined by the coefficient of variation (CV) percentage. The finding shows ten (10) prevention cost components,and nineteen (19) prevention cost items wereallocatedduring the pre-construction phase. The cost components werethe Plant Costs, OSH Management Costs, Housekeeping Costs, Special Work Condition Costs, Evaluation and Monitoring Costs, Emergency Response Costs, Electrical Work Costs, PPE and Training Costs, Facilities on Site Costs, and Insurance Costs. This study finds out that all these prevention cost components are important to prevent accidents for the employees when carrying out work on-site. Therefore,clientsshould considerthe availability of these cost componentsin the planning and preparation phasesof an urban rail infrastructure project.Thus, the most logical amount of prevention cost components can be achieved in the future project and creating the awareness of these costs to the clients.