Indexing of Factors Affecting Time and Cost Overrun in Construction Projects

Kumar Gourav Shakya,Er. Himmi Gupta
DOI: https://doi.org/10.22214/ijraset.2022.45477
2022-07-31
International Journal for Research in Applied Science and Engineering Technology
Abstract:Abstract: In a construction project, time overrun occurs when the work specified in the contract is not executed within the specified time frame and when the entire project cost exceeds for whatever causes, this is referred to as cost overrun. This study aim to analyze these factors that cause above delays in construction projects. A total 47 such factors were identified and classified into 8 segments, which are then indexing by using the method Relative Importance Index (RII).