Digital project management in infrastructure project: a case study of Nagpur Metro Rail Project
Pratik D. Pakhale,Aritra Pal
DOI: https://doi.org/10.1007/s42107-020-00224-4
2020-01-31
Asian Journal of Civil Engineering
Abstract:The traditional approach followed in the construction industry often struggles to deliver the project on time and within budget. Lack of precision and exactness in the process of information flow leads to conflict between stakeholders. Inability to understand and interpret 2D drawings often leads to reductions in productivity, more chances of defects resulting in rework, wastage of resources, extra cost and time. Design management, document control, quality assurance, timely completion, cost control, risk mitigation, maintaining safe construction environment, and effective operation & maintenance of services are among the most common challenges faced by the construction industry. Could we address the challenges with the application of 5D Building Information Modeling (BIM)? The research is carried out to identify the potential of integrated 5D BIM-based digital project management system for infrastructure projects by analyzing a case study of Nagpur Metro Rail Project, the 5D integrated BIM implementation challenges and benefits achieved were studied. To carry out the study, unstructured interviews, discussions and questionnaire surveys among various stakeholders working on 5D BIM platform in Nagpur Metro were conducted. The purpose of the study was to understand various stakeholders’ role on 5D BIM platform, the process involved in 5D BIM, challenges observed in those process and benefits achieved as compared to the traditional approach. Reduced rework, reduced coordination problems, better communication between various stakeholders, reduced documents errors, fewer claims, reduced paperwork, reduction in time and cost overrun, reduction in lifecycle cost are amongst the many benefits. Training of employees, non-availability of GIS team, conversion of 2D drawings to 3D models, non-availability of BIM contract from the starting phase of the project were some of the identified challenges. The results show that 5D BIM-based digital project management system integrates all the processes, improving the efficiency and effectiveness of the project, right from design to operation and maintenance stage.