Integrated cost, quality, risk and schedule control through earned value management (EVM)

Tahereh Khesal,Abbas Saghaei,Mohammad Khalilzadeh,Masoud Rahiminezhad Galankashi,Roya Soltani
DOI: https://doi.org/10.1108/JEDT-07-2018-0119
2019-10-07
Journal of Engineering, Design and Technology
Abstract:The purpose of this paper is to propose an integrated earned value management (EVM) approach to control quality, cost, schedule and risk of projects.
What problem does this paper attempt to address?